Calculate flat roof area, drainage falls, and membrane quantities. Enter dimensions, specify fall ratio, and get material quantities. Free, no signup.
Calculate actual roof surface area from plan dimensions and pitch
Interactive demoTry our real system in 30 seconds or less
The same takeoff workstation that's in the app. No sign-in needed.
Free Roofing Calculator
Full roofing calculator - pitch, area, rafters, materials
Free Bird's Mouth Calculator
Seat cut and plumb cut angles with ⅓-depth check
Free Construction Calculator
Areas, timber lengths, and building materials
Free Quote Generator
Turn measurements into a professional quote
Free Quote Generator
Turn your measurements into a professional quote
Free Purchase Order Generator
Create supplier order forms from your calculations
Free Invoice Generator
Send professional invoices and get paid faster
Start free trial
Full quoting, takeoff, and job management
Building regs require a minimum 1:80 fall (1.25% slope, ~0.7°) for water drainage. Most flat roofs are 1:40 to 1:60 (1.4° to 2.4°). The fall directs water to outlets or gutters.
Bitumen felt: 2-3 layers, each covering full area (multiply by layers). EPDM rubber: single sheet, area + 150mm perimeter upturn. GRP fibreglass: resin + matting, ~1.5kg/m² resin per layer. TPO: single-ple, similar to EPDM.
Warm deck: insulation above the deck (most common). Cold deck: insulation below (requires ventilation). Typical PIR insulation: 100-150mm for U-value compliance. Calculate by area × thickness.
Flat roof outlets sized by plan area and rainfall intensity. 1 outlet per 40-80 m² (UK typical). Check fall directs water to outlets - any ponding area is a failure point.
area = length × width
fall = run × (1 ÷ ratio)
membrane = area × layers + perimeter × 0.15
volume = area × thickness_m
Minimum 1:80 (0.7°) per UK Building Regs. Recommended 1:40 (1.4°) to 1:60 (1.0°) for positive drainage.
Area × number of layers + 150mm upstand perimeter. 3-layer felt on 50 m² roof: 50 × 3 = 150 m² + ~6 m² upstands = ~156 m².
Typically 100-150mm PIR for U-value compliance. Check Part L for current requirements. Calculate volume = area × thickness.
One that handles area, falls, membrane layers, and insulation. This tool does all, free.